charm AT lists.siebelschool.illinois.edu
Subject: Charm++ parallel programming system
List archive
- From: François Tessier <francois.tessier AT inria.fr>
- To: Harshitha Menon <gplkrsh2 AT illinois.edu>
- Cc: "charm AT cs.uiuc.edu" <charm AT cs.uiuc.edu>
- Subject: Re: [charm] Save data between two load balancing steps
- Date: Tue, 11 Mar 2014 15:02:41 +0100
- List-archive: <http://lists.cs.uiuc.edu/pipermail/charm/>
- List-id: CHARM parallel programming system <charm.cs.uiuc.edu>
Oh, ok. I thought the LB instance was
deleted after each load balancing.
Thx :) ___________________ François TESSIER PhD Student at University of Bordeaux Inria - Runtime Team Tel : 0033.5.24.57.41.52 francois.tessier AT inria.fr http://runtime.bordeaux.inria.fr/ftessier/ PGP 0x8096B5FAOn 11/03/2014 15:00, Harshitha Menon wrote: You can save whatever data you require in the
member variables of your load balancer class.
On Tue, Mar 11, 2014 at 4:15 AM,
François Tessier <francois.tessier AT inria.fr>
wrote:
Hello, The first step of my load balancing algorithm could be carried out once during the first call of the load balancer. For each next call, it could be great to get back these information and not recalculate them. Is it possible to do that? To save some data (just an array in my case) from a call to the load balancer to another? Thanks! François -- ___________________ François TESSIER PhD Student at University of Bordeaux Inria - Runtime Team Tel : 0033.5.24.57.41.52 francois.tessier AT inria.fr http://runtime.bordeaux.inria.fr/ftessier/ PGP 0x8096B5FA |
Attachment:
signature.asc
Description: OpenPGP digital signature
- [charm] Save data between two load balancing steps, François Tessier, 03/11/2014
- <Possible follow-up(s)>
- Re: [charm] Save data between two load balancing steps, Harshitha Menon, 03/11/2014
- Re: [charm] Save data between two load balancing steps, François Tessier, 03/11/2014
Archive powered by MHonArc 2.6.16.