charm AT lists.siebelschool.illinois.edu
Subject: Charm++ parallel programming system
List archive
- From: "Kale, Laxmikant V" <kale AT illinois.edu>
- To: Hrushit Parikh <parikhhrushit AT hotmail.com>, "charm AT cs.uiuc.edu" <charm AT cs.uiuc.edu>
- Subject: Re: [charm] Unable to run UTS with projections
- Date: Mon, 16 Feb 2015 02:57:55 +0000
- Accept-language: en-US
- List-archive: <http://lists.cs.uiuc.edu/pipermail/charm/>
- List-id: CHARM parallel programming system <charm.cs.uiuc.edu>
(In addition to Phil’s advice)
How big is the trace data with 19 queens? (are you using grain size control?)
Also, I am not sure why you’d want detail trace data for a divide-and-conquer program. Maybe summary data is enough?
-tracemode summary.
--
---
Laxmikant (Sanjay) Kale http://charm.cs.uiuc.edu
Professor, Computer Science kale AT illinois.edu
201 N. Goodwin Avenue Ph: (217) 244-0094
Urbana, IL 61801-2302
From: Hrushit Parikh <parikhhrushit AT hotmail.com>
Date: Sunday, February 15, 2015 at 7:18 PM
To: "charm AT cs.uiuc.edu" <charm AT cs.uiuc.edu>
Subject: [charm] Unable to run UTS with projections
Date: Sunday, February 15, 2015 at 7:18 PM
To: "charm AT cs.uiuc.edu" <charm AT cs.uiuc.edu>
Subject: [charm] Unable to run UTS with projections
Hi,
I am trying to get projections analysis on the UTS benchmark (Tree T1L) in charm++ using the "-tracemode projections" option. I use the workstealing seed balancer.
I am using charm-6.5.1 version on the UT Austin Stampede cluster. The stampede cluster uses ibrun to launch the executable. I have compiled charm using ./build charm++ mpi-linux-x86_64 mpicxx -j16.
With 256 Processors, the T1L run takes only 0.3 seconds when I compile charm with the "--with-production" option (to disable traces). However, with traces enabled the execution time exceeds 15 minutes and I have to kill the program.
I tried running NQueens with the same workstealing balancer on 256 Processors with traces enabled. For queens upto 19 (grainsize=3) it runs fine and projections data is generated, but with 20 queens it takes forever.
Any ideas why UTS takes forever with traces enabled or am I missing something?
Thank you,
Hrushit
I am trying to get projections analysis on the UTS benchmark (Tree T1L) in charm++ using the "-tracemode projections" option. I use the workstealing seed balancer.
I am using charm-6.5.1 version on the UT Austin Stampede cluster. The stampede cluster uses ibrun to launch the executable. I have compiled charm using ./build charm++ mpi-linux-x86_64 mpicxx -j16.
With 256 Processors, the T1L run takes only 0.3 seconds when I compile charm with the "--with-production" option (to disable traces). However, with traces enabled the execution time exceeds 15 minutes and I have to kill the program.
I tried running NQueens with the same workstealing balancer on 256 Processors with traces enabled. For queens upto 19 (grainsize=3) it runs fine and projections data is generated, but with 20 queens it takes forever.
Any ideas why UTS takes forever with traces enabled or am I missing something?
Thank you,
Hrushit
- [charm] Unable to run UTS with projections, Hrushit Parikh, 02/15/2015
- Re: [charm] Unable to run UTS with projections, Phil Miller, 02/15/2015
- Re: [charm] Unable to run UTS with projections, Hrushit Parikh, 02/17/2015
- Re: [charm] Unable to run UTS with projections, Phil Miller, 02/17/2015
- Re: [charm] Unable to run UTS with projections, Hrushit Parikh, 02/17/2015
- Re: [charm] Unable to run UTS with projections, Phil Miller, 02/17/2015
- Re: [charm] Unable to run UTS with projections, Hrushit Parikh, 02/17/2015
- Re: [charm] Unable to run UTS with projections, Kale, Laxmikant V, 02/15/2015
- Re: [charm] Unable to run UTS with projections, Phil Miller, 02/15/2015
Archive powered by MHonArc 2.6.16.