charm AT lists.siebelschool.illinois.edu
Subject: Charm++ parallel programming system
List archive
- From: Jozsef Bakosi <jbakosi AT gmail.com>
- To: "charm AT cs.uiuc.edu" <charm AT cs.uiuc.edu>
- Subject: [charm] Run multiple charm executables simultaneously
- Date: Mon, 27 Jul 2015 12:53:16 -0600
- List-archive: <http://lists.cs.uiuc.edu/pipermail/charm/>
- List-id: CHARM parallel programming system <charm.cs.uiuc.edu>
Hi folks,
What is the simplest way to run multiple charm executables at the same time?
I'm setting up ctest to run a regression test suite and running three runs (a 1, a 2, and a 4 processor job each with charmrun +p1, +p2, and +p4) yields overloading the 7 ranks only four CPUs on an 8 core machine. I'm using mpi-linux-x86_64.
Thanks,
Jozsef
- [charm] Run multiple charm executables simultaneously, Jozsef Bakosi, 07/27/2015
- Re: [charm] Run multiple charm executables simultaneously, Jozsef Bakosi, 07/28/2015
Archive powered by MHonArc 2.6.16.